Controls and Automation
Cost Effective, Bespoke Pumping Station Control System
Cost-Effective Custom Control Panel for Adoption Adoptable pumping stations are a waste management solution that allows site developers to pass operational responsibility of the station and control ...
Custom Control Panel for Dumfries House
Our client, Pump Action recently enquired for a replacement control panel that T-T had previously supplied. The control panel installed at Dumfries House in Ayrshire, Scotland was requested as high ...
Bespoke Pumping Solutions for the UK’s Largest Turf Grower
One of the UK's largest Turf Growers with over a 2000 acre farm, recently contacted T-T to assist in the supply of bespoke pumping equipment. T-T was contracted to design a control panel to operate ...
T-T’s Float Switch Journey: From Design to Product Launch
Embarking on product development is not only an innovative journey for a company, but sometimes a necessary one. We were soon to recognise existing problems with the usability and reliability of a ...
Customised Control Panels for Off-Grid Water System
T-T Controls and Automation provided two sets of control panels for villages within the Democratic Republic of the Congo in Africa. The Sisters of Notre Dame de Namur are a Roman Catholic institute, ...
David Wilson Homes, Cheshire - SEER Monitoring Range
As part of the trialing and testing of the new Seer Monitoring Range, we installed a Seer Advanced unit at a David Wilson Homes site based in Crewe, Cheshire. The 72 property development required an ...
Bakkavor, North Carolina - Bespoke Control Panels
T-T Controls have supplied five bespoke control panels to LAC Conveyors, which are now installed at Bakkavor pizza and bread division, a new factory being commissioned in Charlotte, North Carolina. ...
Bank Station - TFL Specification Control Panels
The Crossrail Elizabeth Line is in its final stages of construction and when complete will provide a new high-speed link through central London. The line will cross 41 stations including Farringdon, ...
Control Panels & Pumps for Tube Station
On Thursday 24th March 2011, a London Underground tube line was suspended after a station was flooded by water leaking from the fountains at Trafalgar Square. Contractors working for the Greater ...